Recipe / Routing in SAP Production Planning

 

The basic purpose of recipe / routing in SAP Production Planning is to charge that costs of a product which cannot be defined as materials / components, such as Fixed cost, variable cost, utilities cost, labor cost etc... and for capacity utilization.


Top FAQ about recipe / routing is:


What is the difference between recipe and routing?


Pertaining to their role in SAP Production Planning, actually there is no difference in a Master recipe and routing. But there are bit differences in their usage and construction.


To understand the difference between these two, we will have to understand their usage first. As per my understanding, recipes are mostly used in process industries whereas routing are used for discrete manufacturing in production industries.


Definition:

Recipe / Routing is the sequence of operations to be followed in order to process / manufacture a Material. Both of these are consists of a header and (several) operations. Each of which is carried out at a primary resource. You have to specify which resource is being used to consume the activities (such as Fixed cost, variable cost, utilities cost, labor cost etc...)


There are some additional features in a Master recipe which doesn’t exists in routing such as…

  • In a Master recipe, phases are assigned to the operations.
  • In a Master recipe, control recipe destination is assigned.
  • Materials (Task list) are assigned within the Master recipe. Whereas in routing, BOM is externally defined and assigned to routing.
  • Process Instructions (PI sheets) can be added to a Master recipe.

Another difference between recipe and routing is of control keys. Such as PI01, PI02 etc… used for recipes and PP01, PP02 etc… are used for routing.

Another question very often asked by the beginners is:

What is the difference between Master Recipe and Control recipe?


Actually there is no difference between a Master recipe and a Control recipe. As per my understanding, the recipe you have created with the recipe builder (C201) for any product is its Master recipe (acts as a template), and when it is used in a Process order it is a control recipe (copy of a Master recipe).

While creating a Master recipe, you will have to mention a destination “Control Recipe” because you cannot assign phases until unless you define its destination.

________________________________________________________

Let’s create a Master Recipe for a product “ABCD”. We will discuss only the mandatory things here.

  • Open a transaction C201.
  • Enter your material “ABCD” and Plant.
  • Enter the validity Key date. Validity date can be from Past or Future. System will only allow the usage of this recipe within the validity period. If key date is not defined, then system will consider the create date as validity start date.
  • You can create “n” number of recipes using the same recipe group (generated with the first recipe)
  • Press ENTER, and you will jump to the next screen.
  • You have to enter “Status” and “Usage” in assignment views.
  • Go to the “Operations” tab. Below are the list of details required to define operations.
  1. Operation / Phase
  2. Phase Indicator
  3. Super-ordinate operation (Assigning phase to the operation)
  4. Resource
  5. Control Key
  6. Operation description
  7. Base quantity and its unit of measure
  8. Activities
  • Go to the “Materials” tab and create the task list (assignment of materials to the phases)
  • Your recipe is created, press SAVE button.



Your comments are very valuable for me...



Wednesday, August 19, 2020

Bill of Materials (BOM) in Production Planning

 


An incorrect BOM can lead to a massive headache, loss of revenue and inventory issues.


Definition:-

Bill of Material (BOM) is part of the Production Planning Master Data. One should have to create a Bill of Material (BOM) for every in-house manufacturing / production material down the level.
BOM can also be used in discrete manufacturing.

An easy definition of a Bill of material (BOM) will be “the components required to manufacture or produce a product with their required quantities as per the “Base Quantity” of product.

Here, Base quantity is very important because requirement and consumption of all components of a BOM are determined as per the Base Quantity of a Bill of Material (BOM).
Bill of Material is also used in standard cost estimation of the products.

There can be multiple alternative BOM for the same product, so that you can consider and use different assessments for the same product. You can also check comparison of cost estimates for same product using different alternative BOM.

BOM Structure:-


For instance, you are creating a Bill of Material (BOM) for a Product “ABCD”

Let’s create a list of details required to create a BOM of “ABCD”:
  • Product code (ABCD)
  • It’s unit of measure (let say Kilogram “KG”)
  • The Base Quantity of Product (consider 10 KG in this case)
  • The components (A, B, C & D), components can be of following types.
  1. Ingredients (with positive quantities)
  2. By-Products (with negative quantities)
  • Required quantity of components in unit of measures to produce the Base Quantity of “ABCD” (10 KG)

Following are the specific features used in process industries to create a Bill of Material (BOM).

  • The BOM is created and edited directly from within the master recipe for which it is required.
  • By creating BOM separately and combine with the master recipe in a Production version. The components of the alternative BOM can then be assigned to the operations or phases of the master recipe.

Steps of creating BOM within the master recipe of “ABCD”:-


  • Open a transaction C202 and enter your Material and Plant (you should have Master recipe already defined/created for “ABCD”).
  • Go to the “Materials” tab.

  • Click on “BOM” button.

  • Enter the components with their required quantities.

  • Go to the Header. 

  • Set the Base Quantity (in this case it is 10 KG)
  • Back screen
  • Assign phase / operation to each component of BOM


Now you have a BOM of “ABCD” and its assignment with Master Recipe, which will be used in cost estimation and process orders.



Wednesday, August 12, 2020

Overview to SAP PP Master Data


The more accurate the master data, the more effective the transactions will be.

When I have started to learn and work with SAP, for me it was very difficult to understand it's basic concepts, terms and technical language. So, the purpose of this article is to help and support the beginners who have just started working in SAP Production and Planning.

Behind every transaction and documentation  in SAP there is a Master Data. I would like to say that Efficiency and perfection of all transactions depends upon the accuracy of Master Data. So, to get better results with SAP, we should have to understand and maintain Master Data nearest to the actual.

Master Data for PP



In general, Master Data in Production and Planning consists of:

  • Material Master
  • Bill of Material (BOM)
  • Work Center
  • Routing / Recipe
  • Production Version

Lets check out the definitions in simple words.

Material Master


The material master contains information of all the materials that a company procures or produces, stores, and sells. It is the company's central source for retrieving material-specific data. This information is stored in individual material master records.
You have to fill in all the required details such as material number (if external number assignment), material type, industry sector, etc. as per company requirements.
We will discuss material master creation process in some other article.



Bill of Material (BOM)


A bill of material (BOM) describes the different components that are required to produce a material/product. Just think of a packet of biscuit, you often see ingredients mentioned on a packet. Bill of material (BOM) is not same but similar to it.
The bill of material contains the item number of each component and it's quantity required in the manufacture of a product and the unit of measure of the item as per the Base quantity. Base quantity is there for the header material. It says that the component quantity mentioned in BOM is required to manufacture "base quantity" of material. This will reflect in the production / process order.
We will discuss Bill of material (BOM) creation process in some other article.



Work Center


A Work Center can be a place or a machine or a labor where production operations/activities are performed. In SAP PP, Work Center is used in routing operations and production orders. It contains data related to scheduling, capacity planning, and production costing. All the manufacturing activities are performed in the work center.
Work centers are also used in other applications (SAP modules) like Plant Maintenance, Project System, and Quality Management.
We will discuss Work Center creation process in some other article.

Routing / Recipe


It is not like a recipe of cooking or baking. In SAP a Routing or Recipe is a description of which operations or list of activities has to be carried out during the production and planning process. It also tells the order or sequence in which the activities/operations needs to be carried out at work centers or machines. There may be several alternative routing / recipes for a product.
We will discuss Routing / Recipe creation process in some other article.



Production Version


The production version is the link between a product BOM (Bill of Material) and the process Routing. It determines which alternative BOM is used together with which routing to produce a material or plan a material. There may be different production versions based on the lot sizes and validity dates.
In a manufacturing environment, we may have different processes or BOM for a same product (with slight changes). To overcome this situation we should have to create alternate BOM and/or routing for the same product. 
For instance we have 2 different BOM (A and B), and 2 Routing/Recipe (X and Y) for the same product. It means we will have to create 4 production versions for this product as below:

  • BOM A with Recipe X
  • BOM A with Recipe Y
  • BOM B with Recipe X
  • BOM B with recipe Y


We will discuss Production Version creation process in some other article.

All of the above master data are needed to execute production process as well as to calculate the costs for this production process.

I would like to say again..!

The more accurate the master data, the more effective the transactions will be.
Have you any queries, please comment below. I will reply for sure.


SAP Production Planning – What it brings to a Business

  A SAP production planning system gives companies the ability to optimize inventory management and scheduling, which leads to better produc...